Lille Langebro

Yesterday a new bridge in Copenhagen opened for cyclists and pedestrians to cross over the harbour from the city side just south of BLOX to Christianshavn.

There appeared to have been no opening ceremony and no notices in the newspaper.

It’s very elegant and forms a gentle curve as it crosses the harbour and my first reaction, on crossing over the bridge, is that it makes the bicycle and pedestrian bridge from Nyhavn to Christianshavn look clunky and over engineered.

 

update - Lille Langebro

Lille Langebro is almost complete with final work on the hard landscaping on the quay at at each side almost finished.

This is the new bridge for cyclists and pedestrians that will cross the harbour from Christians Brygge, from the quayside opposite the end of Vester Voldgade, to the Christianshavn side and lining up with Langebrogade.

Current traffic surveys suggest that there are around 40,000 cycle journeys a day across the main road bridge - an astounding number - and planners hope that at least 16,000 cyclists a day will change there route to the new bridge and also avoid the heavy and relatively fast road traffic along Hans Christian Andersens Boulevard.

The official opening is set for the Autumn but opening and closing of the new bridge is already controlled from the tower of the main bridge so presumably the wait is for safety tests.

There was a post on this site when the sections of the new bridge were lifted into place but Realdania have since posted a time lapse record of that work over two days when the four sections were delivered by barge from where they were manufactured in the Netherlands and were lifted into place by a giant crane.

post on Lille Langebro in September 2017

lifting the sections of the bridge into place April 2019

Update - Lille Langebro

 

The four sections of the new cycle and pedestrian bridge have arrived from the Netherlands on a gigantic barge and are being lifted into place … the work started yesterday and it looks as if all the sections will be in place today.

These photographs show what will be the first fixed section from the city side as it was taken off the barge by a huge floating crane and swung across the harbour and lowered into place to be guided down by engineers on the quayside by BLOX and engineers in two small boats by the pier in the harbour. The sections in place, in the photographs, are the first section from the Amager side and the part that swings open on the the city side - general views are photographed here from Langebro.

The bridge will be completed by late summer and then the opening and closing of the swing sections will be controlled from the bridge house on the existing road bridge.

earlier post
earlier thought

 

Lille Langebro …. news

 

 

A newsletter has just come through from the BLOX website to say that there has been an accident in Hamburg where a crane failed as it was lifting the sections of the new bridge onto a barge for them to be transported to Copenhagen.

Two of the four massive sections of the bridge have been damaged beyond repair and will have to be remade. No one was hurt in the accident but these sections took a whole year to fabricate so there will be a long delay to the completion and opening of the bridge that will form a bike and pedestrian link between Christianshavn and the quay alongside the newly opened BLOX building.